Resources
What a buyer needs before raising an order: the catalogue, the dimensional datasheet, the installation method and the answers to the five questions that repeat in every email.
Document library
Files are gated only where it matters — catalogues behind a form, datasheets open. Everything else is a plain link so search engines can index the page.
| Document | Family | Language | Format | Status |
|---|---|---|---|---|
| General catalogue — pipes, fittings, valves | All | EN / RU | On request | |
| PVC-U dimensional datasheet | PVC-U | EN | PDF / XLSX | On request |
| PPR dimensional datasheet | PPR | EN | PDF / XLSX | On request |
| PE 100 pressure / SDR table | PE | EN | On request | |
| Installation & jointing manual | All | EN | On request | |
| Chemical resistance chart | PVC-U / PE | EN | On request | |
| Container loading guide | Logistics | EN | On request |
Pages that earn
the search traffic
Each note is a standalone article targeting a question a buyer types. Three to start; the list grows with your enquiries.
PN 10 or PN 16 for a buried main?
How surge pressure, burial depth and soil load change the class you should order.
Solvent weld vs rubber ring: which fails first
Failure modes in trench conditions, and where each joint type is the right answer.
How many metres fit in a 40' HQ
Loading density by diameter and the packing choices that change freight per metre.
Asked before every order
What is your minimum order quantity?
MOQ is set per diameter and per container. A mixed-diameter 20' container is normally the practical minimum, and single-size trial quantities are accepted on sizes held in stock. Ask for a loading plan for your mix and the MOQ falls out of it — there is no single number that applies to every diameter.
Can you produce to our standard rather than yours?
Yes, where tooling and compound allow. Send the standard reference (EN, ASTM, DIN, ISO or your national equivalent) and the pressure class. If a dimension is outside the moulds, we tell you before the quotation, not after the deposit.
Do you offer OEM / private label?
Pipe marking, printing, packing and catalogue branding can all be buyer-owned on defined volumes. A separate landing page for this is planned — it is a different buyer from the project contractor.
What documents come with the shipment?
Mill test certificate, dimensional report, packing list, commercial invoice, bill of lading, and certificate of origin (CO / Form E / Form R) as required by destination. Third-party inspection reports are added when the order calls for them.
What are the payment and lead time terms?
Payment and lead time are quoted per order. The usual structure is 30 % T/T deposit with the balance against a copy of the B/L, with lead time running from confirmation of the drawing and receipt of the deposit. Where a tender requires L/C, terms are stated in the quotation.
Can't find the file?
Ask for it. Datasheets, certificates and drawings are sent the same working day.